JBH Remodeling Group Remodeling Group Sdn Bhd Request a quotation
About us

Just Be Honest

That is what JBH stands for, and it was chosen before there was much of a company to attach it to. It is still the least complicated way to describe how we quote, how we report a problem, and how we hand a floor back.

The company

10 years working around other people’s opening hours

JBH Remodeling Group Sdn Bhd was incorporated on 10 March 2016 to take on renovation, interior and construction work. What the business actually grew into is narrower and more useful: works inside properties that cannot stop trading.

Most of what we do now sits inside shopping malls and office towers — tenancy lots stripped and restored between tenants, ceilings and flooring repaired on live trading levels, plumbing and fire-rated compliance work, and civil works around a building that stays open throughout. Property teams keep us on because the work is finished and invisible by the time the doors open.

We are not a large contractor and we do not present ourselves as one. The core team is small and the same people run the sites. That is the reason a property manager can call once and get a decision.

Hoarding boards enclosing a work area in a mall corridor during trading hours.
Hoarding in a trading corridor Works screened from shoppers
A retail lot stripped back to bare condition, ceiling grid and services exposed.
Tenancy lot stripped to bare condition Restoration · handover ready
A cleaned, empty retail lot with lighting on, ready for handback.
Cleared and ready for handback 06:00 · site signed off

How we work

Working inside a trading property

The discipline is not the trade work. It is everything wrapped around it — permits, access, protection, sequencing and reinstatement.

  1. 01

    Scope and quote

    We walk the lot or the affected area with the property team, agree the scope against the works order, and price it. Access constraints and the available window are settled here, not on site.

  2. 02

    Permits and access

    Permit-to-work, contractor passes, lift and loading-bay bookings, and hot-works clearance where the scope needs it. Site personnel carry valid CIDB Construction Personnel Cards.

  3. 03

    Hoarding and protection

    Hoarding or barricade up, floor and shopfront protection down, dust screening where the work demands it. Nothing that reaches a shopper is left exposed.

  4. 04

    The works window

    Work runs after trading hours. Trades are sequenced so one night is one complete stage rather than a job left half-open across a week.

  5. 05

    Clear, clean, reinstate

    Debris removed the same night, surfaces cleaned, protection lifted, lighting and services restored, and the area checked before the property team walks it.

  6. 06

    Handback and sign-off

    The area is returned to the property team on schedule with the works order closed out. Defects, if any, are attended in the next window, not the next month.

Registration & compliance

Checkable before you call

Registration is published in full so a procurement team can verify it directly with CIDB rather than taking our word for it.

CIDB registration
0120190926-WP032387
Grade
G3
Category B
B04 — Kerja am bangunan — general building works
Category CE
CE21 — Kerja am kejuruteraan awam — general civil engineering works
Registered since
2019
Valid through
11 June 2027
Status
AKTIF
Safety
OSH-Coordinator trained — JKKP-approved provider, 2024
Site personnel
CIDB Construction Personnel Card holders on site
Company no.
1179091-W

Full certificates available on request.

Structure

Who you deal with

A works order is run by the same two site coordinators and signed off by the same management. Nothing is handed to a stranger.

Site coordination kit — hard hats, high-visibility vests, rolled plans, a two-way radio and safety gloves on a site table.
Site coordination setup PPE · plans · site comms
Managing Director
Ooi Wen Chiong
Managing Executive
Lim Ya Woon
Site Coordinators
Two, assigned per property
Account Executive
Quotation, billing and works orders
Administration
Two, permits and documentation

Trade crews are directly supervised on site, and site personnel hold valid CIDB Construction Personnel Cards as the registration requires.

Enquiries

Ten years of this. Send us the next one.

13 engagements are active right now across shopping malls, office towers and commercial properties. We will quote yours.